1、delivered with each machine delivery,includes also assembly and dimension drawings and part lists,Safety instructions-Lifting,Mounting of Equipment,During Operation,the supplier of the screen is only responsible for the assembly of the screen,prior to delivery,during the mounting,the fastening of th
2、e washer installed at the end of,the shaft of the electric motor must be taken into account!,Check the maximum feed pressure of the screen from the dimensional,drawing appended to the instructions,Do not use the screen at a temperature higher than notified while the,order was being made,When the ope
3、rating temperature exceeds 65C(prEN563),even short-term,surface contact may cause skin burn,All original guards of the screen must be appropriately fastened while,the screen is running-do not remove them during operation!,All maintenance of the screen and its drive motor is forbidden during operatio
4、n,Safety instructions,de-aeration of the screen,Check the maximum feed pressure of the screen from the dimensional,drawing appended to the instructions,Do not use the screen at a temperature higher than notified while the,order was being made,When the operating temperature exceeds 65C(prEN563),even
5、short-term,surface contact may cause skin burn,All original guards of the screen must be appropriately fastened while,the screen is running-do not remove them during operation!,All maintenance of the screen and its drive motor is forbidden during operation,except:,lubrication of bearings,adjusting s
6、ealing water flow and pressure,During Operation,Safety instructions,Use appropriate hoisting equipment when lifting the screen,Before maintenance,stop the drive motor and disconnect it from the,electrical supply,Before opening the cover of the screen:,make sure that the screen is de pressurized,make
7、 sure that no liquid or stock can flow into the screen,The screen can be started after maintenance only after:,the cover of the screen has been closed,all original guards have been installed properly,Measure the thickness of the screen material regularly,The sealing water valve must be opened before
8、 starting,the drive motor of the screen!,During Operation,Power transmission in Andritz screens:,V-belts,Gearbox-only in large special units,NOTE!,Do not tension the belts over,the recommended area!,Tension Principle,Belt deflection,Bending force F,-Check the tensioning after 48 hours use,-Do not te
9、nsion the belt over the recommended range,Equipment,F10,F20,F30,F40,F50,Deflection(mm),15,15,20,20,25,Belt profile,SPB,SPC,Smaller pulley,160-224,236-315,224-355,375-560,mm,F(N),35-50,50-65,60-90,90-120,Tension V-belts,F60,32,General instructions for installation,Piping,Pipes should be supported in
10、such a way that the weight of the pipes is not,taken by the screen,In locating the supports,take care to ensure that the pipes do not cause,stress to the screen,The supports must allow for thermal expansion of the pipes,If not,connections and screen body will be damaged!,Feed,accept,reject,reject di
11、lution,rotor dilution,sealwater,deaeration,junk trap,emptying/flushing,Piping and Valve installation,Inspection before operation,Check belt tensioning,the direction of the motor rotation,foundation,foundation bolts and“V-belt pulley taperlocks”,Check that the interior is clean and that no foreign ob
12、jects have,entered the screen,Inspect the pipe supports,Remove the screen cylinder before starting the screen for the first time(not always necessary,normally according to Andritz start-up supervisor instructions),Operation instructions Before starting the screen,Instrumentation and alarms,Always ca
13、rry out a test run with water before productive operation-then the,flow control instrumentation can be adjusted and the pressure instruments,be checked.,To prevent the screen from plugging one of the most important of the instruments is the pressure difference control alarm,The seal water measuring
14、rotameter is equipped with a flow guard which can,be connected to the alarm center,Feed stock consistency regulation takes place right after the supply tank by,means of the consistency or dilution flow controllers,Operation instructions Before starting the screen,Operating instructions-Starting,Star
15、t the screen in the following sequence:,.Ensure the seal water flow(2-5 l/min),.Fill the screen with water,.Close the air exhaust valve at the screen cover,.Start the screen motor,.Open the reject valve(20%),keep accept valve closed,open reject dilution(30%),1,2,3,4,5,.Adjust the feed consistency to
16、 the level shown in the flow sheet,.Adjust the accept valve to the required flow with the feed valve fully open,.Adjust the amount of flow to be discharged as reject with the reject valve,.Deaerate the screen through the air exhaust valve on the screen cover and close,the valve when there is a conti
17、nuous flow of liquid from the connection,8,9,10,11,.Open the feed valve fully,6,7,.Start the feed pump of the screen,Operation control and flow adjustment,Most important in operational control are:,When the screen has been started,it requires very little attention under,normal operation conditions,p
18、ressure difference measurement,reject flow regulation,reject dilution regulation,electric motor load,The pressure and flow of seal water should be checked once in each shift!,Operating instructions-Starting,Stop and flush the screen in the following sequence:,.Stop the feed pump,.Close the accept va
19、lve fully while the screen is still operating,.Close the feed valve fully,.Open the dilution valve in order to flush the reject and the fibers to reject,treatment,.Close the reject valve and open the air exhaust valve on the screen cover,.Continue flushing until the liquid flowing from the air exhau
20、st pipe no,longer contains fibers,.Unless it is necessary to open the cover and carry out a maintenance,inspection,the screen can be left filled with water until the next start-up!,Close the dilution,fresh water,and air exhaust valves.Stop the screen motor.,Close the seal water valve.,.If the downti
21、me is longer or intended for maintenance inspections,leave,the air exhaust valve open and close only the dilution and fresh water valves.,Stop the screen motor.Drain the screen by opening the drain valve.,Close the seal water valve.,1,2,3,4,5,6,7,8,.Ensure that the motor is disconnected from the ele
22、ctrical network!,9,Operating instructions-Stopping,Foreign objects in a ModuScreen,ModuScreen does not function,Foundation is not steady enough,Shaft is bent,Rotor is damaged,Rotor not in balance,Screen cylinder is damaged,Sliding surfaces of seal are damaged,Seals are wrongly installed,Seals are of
23、 wrong quality,Seal water filter is blocked-up,Too much grease in bearings,Defective lubrication,Bearings are damaged,Dirt or water in bearings,Unusually high power consumption,ModuScreen is vibrating,High noise level,Sealing housing is leaking,Seal water amount is low,Bearings are too warm,Short li
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 德里 设备 操作 安装 维修 手册

链接地址:https://www.desk33.com/p-378802.html